The information here is compiled from official government sources, linked on each page. Government rules change often, so we can't guarantee every detail is current — always check the official source before you act.
KaamKar
Read this page in:मराठी
Maharashtra✓ Source-checked 20 July 2026

Fire NOC (Maharashtra) — fire safety no-objection certificate

Also known as: fire noc, fire safety certificate Maharashtra, provisional fire NOC, final fire NOC

The fire-safety clearance required under the Maharashtra Fire Prevention and Life Safety Measures Act, 2006 for buildings and premises above prescribed height/area thresholds. It runs in two stages — a Provisional NOC on the plans and a Final NOC after fire systems are installed and inspected. Whether a specific restaurant needs it depends on the building, not just the business.

Issued by
Maharashtra Fire & Emergency Services / local Chief Fire Officer
Official portal
Maharashtra Fire & Emergency Services
You get
Fire NOC (Provisional and/or Final) — Valid 1 year
Offline options
Local Fire Brigade / Chief Fire Officer's office, Municipal corporation fire department

Who can apply

  • Fire NOC applies to buildings/premises above prescribed height or area thresholds under the Maharashtra Fire Prevention and Life Safety Measures Act, 2006 and Rules, 2009; commercial buildings above the notified height (commonly cited around 15 metres) and various occupancy/area triggers require it
  • Applicability is driven by the building (height, area, occupancy type), not merely by running a restaurant — a small eatery in a low-rise building may not independently trigger a fresh NOC, while the same restaurant in a high-rise/mall relies on the building's fire clearance
  • The process has two stages: a Provisional NOC on the building/fire-safety plans, then a Final NOC after fire-fighting and life-safety systems are installed and inspected

What it costs

Fire NOC / scrutiny feeFees are set by the concerned authority and vary by built-up area and occupancy; the exact fee schedule must be confirmed with the local fire department. Amount shown as 0 pending verification — do not treat as final.Free

How long it takes

Typically 15–60 days.

Timelines are set by the concerned authority; provisional and final stages are separate. Confirm the notified processing timeline.

The full step-by-step guide

What's inside for this procedure:

  • 5 steps in exact order, with the official link at each one
  • 4 documents — accepted alternatives
  • 4 common reasons applications get rejected, and how to avoid each
  • A 2-question intake that prunes the checklist to your situation
  • Progress tracking with your deadlines, notes, and application numbers
Free while KaamKar is in early access — sign in and we'll open the full guide and track it as your own case.

Common questions

Does every restaurant need a Fire NOC?

No. It depends on the building's height, area and occupancy under the Maharashtra Fire Prevention and Life Safety Measures Act. A small eatery in a compliant low-rise may not independently trigger a fresh NOC, while premises in a high-rise or mall rely on the building's fire clearance. Confirm for your specific building.

What is the difference between Provisional and Final Fire NOC?

The Provisional NOC is granted on the building/fire-safety plans (planning stage); the Final NOC is issued after the fire-fighting and life-safety systems are installed and inspected.

How often is a Fire NOC renewed?

The Final NOC is renewed periodically (commonly annually) and requires ongoing maintenance and periodic fire-safety audits. Confirm the current cycle with the concerned authority.

Would you rather have someone do this for you?

The guide above covers the full procedure. If you would prefer professional help, let us know — assisted filing is on the way, and this helps us decide which services and cities come first.

We record the service, the state and the first 3 digits of your pincode — enough to see which areas need help, not enough to identify you. No name, no phone number.

Where this comes from

This guide is put together from the official government sources listed below. We last reviewed it on 20 July 2026. Government rules and fees change often, and official websites are sometimes incomplete or unclear, so we cannot promise every detail is current. We make every effort to keep this updated, but there is no guarantee. Always check the official source linked below before you act or pay.

Recent changes

  • 20 July 2026 Re-voiced steps to the action-first step-writing standard (docs/STEP-WRITING-STANDARD.md): second-person imperative, action first, who-you-need surfaced; all facts, citations, fees and references preserved.
  • 14 July 2026 Initial authoring (Verification in progress): two-stage Fire NOC under the Maharashtra Fire Prevention and Life Safety Measures Act 2006, building-driven applicability, provisional-vs-final, maintenance/audit obligations. Exact height/area thresholds, fees and timelines flagged for verification against MFES and the Act.

Official sources for this guide

KaamKar is an independent guide, not a government website. Apply only on the official portal linked above. Content prepared to published requirements — no outcomes are guaranteed.